CABDA continues to expand the Emukoye project, extending service to additional villages.
As of January 2025: 101 water connections completed in Phase 1 of the project (primarily in Emukoye village), 119 connections completed in Phase 2 (primarily in Musango and Mulwanda)
As of June 2025: An additional 50 connections completed in Musango and Mulwanda
Total people served by the system: 1,890
Work has also begun to extend the water pipeline to Musambirisi, a nearby community of 530 people, marking the next phase of expansion.
The Emukoye project is transforming the communities surrounding Emukoye spring. When we first visited the area, we encountered a constant stream of people—mostly women and girls—walking to the spring to collect water. When we pass through the area today, we see water taps at nearly every household. Women proudly share their stories of how their lives have improved now that they have water piped to their homes. Expanding Sanitation Access With water connections in place, the next essential step is ensuring that every household has a safe, private toilet and bathing facility. CABDA has completed 86 toilets to date—27 in Year 1 and 59 more in the past five months.
To date:
86 completed toilets
140 households have completed the septic pit and concrete slab phase
The remaining toilet superstructures—walls, roofing, and doors—must be
completed by the homeowners
The main challenge is completing the homeowner-funded toilet superstructures. CABDA is working with community members to accelerate construction, as faster completion means improved health for families. System Expansion and Power Supply Upgrade To keep pace with growing water demand, CABDA has also evaluated options for increasing the system’s pumping capacity. Their analysis determined that the most effective solution is to extend the electric grid to the spring site. CABDA has submitted a formal application to the power company, and they project the community will be able to pump water at night by the end of the summer 2025.
A local crew is trained to construct the septic pits. Each pit is stabilized with 6 concrete rings that contain the waste.
Agnes and Benson are among the most vulnerable families Water1st is tracking. Thanks to the Emukoye system, they now have water at home—one of 31 out of 40 households successfully connected so far.
All households receive the same septic pit and toilet pan. The superstructure is built by the homeowner and varies—e.g., timber/thatch (upper) or masonry/iron sheet/tile (lower).